Synopsis Explained
last modified
03-10-2008 14:48
|
RUN OR MACHINE STUDIES
|
SHUTDOWN
|
|
|
The front end shutter is opened. After a refill from 0mA, the user must re-open it manually. |
n/a
|
|
|
The front end shutter is opened. After a refill from 0mA, the shutter is automatically opened. |
n/a
|
|
|
The front end shutter is closed due to an error. This cannot be opened until the error is solved. |
The front end shutter is closed due to technical maintenance. |
|
|
|
The front end is blocked on purpose by the front end group. |
|
|
|
The front end shutter is closed. |
|
| Communication error or plc program not running. | Communication error or plc program not running. |
|
Current
|
Actual current of the electron beam in the storage ring
|
|
Mode
|
|
|
Lifetime
|
Lifetime of the stored electron beam
|
|
ID
|
Status of beam shutters of insertion device beamlines
|
|
Bendings
|
Status of beam shutters of bending magnet beamlines
|