Huber tower

last modified 04-09-2008 14:14



Vertical section.


Huber Tower inside the existing 4+2 axis diffractometer.


Huber Tower as support for the furnace.


GISAXS setup with furnace.


Be dome cryostat.


European Synchrotron Radiation Facility