|
|
The beam steering multilayer
last modified
04-12-2007 18:10
 |
- large angle deflection (5.5°) for sufficient physical separation
of the two branches
- multilayer can match the bandwidth of the undulator
- idea of using both microscopes simultaneously
- carousel allows the device to be equipped with several multilayers
to cover the whole energy from 3-7keV
|
Current equipment of the assembly:
- Ni and Si mirrors
- Ni-B4C multilayer with variable d-spacing optimized
for experiments at the Ca K-edge
|
 |
|
-
Proposal deadline for beamtime March 2013 to July 2013:
01 September 2012
Long Term Projects:
15 January 2013
Review Committee Meetings:
25-26 October 2012
|